Alle Kategorien
Zurück

Produkte anpassen – Stahlhülse Deutschland

Bestellmenge: 600 Stück monatlich  

Vom Kunden geforderte sehr wettbewerbsfähige Preise

Unsere Situationsanalyse:

The cost of materials can not be reduced, the quality can not be reduced any more, the only thing we improve is the process and efficiency.

图片 3.jpg

 

 We carefully studied the customer's drawing, in the second sequence process can use the special plane operation machine to improve the efficiency, so we immediately found the equipment factory to request a customized equipment, experiment our ideas.

图片 4.jpg

 

 At the same time, we customize molding tools, prepare raw materials, timely arrange one sequence production, so that the equipment is completed, can connect the two sequence production, save time, and provide customers with sample testing earlier.

图片 5.jpg

 

The results proved that our idea was completely feasible. The first sequence process took 40 seconds, and the second sequence on special plane machine took 9 seconds, so

 

We used four set of 1st sequence process machines with a special plane model machine ,

which greatly improved the production efficiency, and the quality was very stable, and successfully received customer orders. 

Zurück

Thema: Automatische Lagerproduktionslinie

ALLER

Bearing used in Textile Equipment

Next
Empfohlene Produkte